Vibration test tr.3000

 svnew011Testing

   All tanks will be tested for standardized specification and deliver for testing at Electricity Authorities of Thailand before submitting to the customer which will be done in 2 way.

1.Routine factory testing

 -Measurement of winding Resistance

 -Measurement of impedance Voltage

 -Measurement of Load  Loss

 -Measurement of No Load Loss

 -Measurement of No Load Current

 -Measurement of insulation Resistance

 -Measurement of Voltage Ratio

 -Check of Polarity and Vector Group

 -Induced Voltage Test

 -Applied Voltage Test

 inspector

svnew02

 2.Special testing

      Special testing which will be done with the requirement of the custom or where a large number of transformer have manufactured.

 -Temperature Rise Test

 -Impulse Voltage Test

 -Sound Level Test

 

 

 

 

 

 

 

facebook_page_plugin

csvlogo

egat  mealogo pealogo

วันนี้วันนี้348
เมื่อวานนี้เมื่อวานนี้390
สัปดาห์นี้สัปดาห์นี้1264
เดือนนี้เดือนนี้7027
ทั้งหมดทั้งหมด813659
3.21.12.88
บริษัท ซีซีหม้อแปลงไฟฟ้า จำกัด

31/1 MOO 15

Soi Ramapattana

Kingkaew 45 Rd.

Rachatava

Bangplee

Samutprakarn 10540 
Tel: 0-2738-5480-6 
Fax: 0-2738-5493

ccinfo@cctransformer.co.th

googlemap

เว๊บไซต์นี้ใช้ Cookies

เพื่อให้ท่านได้รับประสบการณ์ที่ดีบนบริการของเว็บไซต์เรา หากท่านใช้บริการเว็บไซต์นี้ต่อไปโดยไม่มีการปรับตั้งค่าใดๆ นั่นเป็นการแสดงว่าท่านอนุญาตยินยอมที่จะรับคุกกี้บนเว็บไซต์และนโยบายสิทธิส่วนบุคคลของเรา ปิดข้อความนี้ กรุณากด "Accept" สามารถเข้าอ่านนโยบายได้ที่ (Policy)