MAINTAIN 2

 

1.Check the colour of silica gel if colour change from blue to pink shall be replace.
2.Check and tighten every HV. and LV. contract avoid possible Arc and Oxidation.
3.Cleaning of Arcing horn checking.

4.HV. and LV. Bushing cleaning.

5.Tap changer swith checking.

6.All seals checking.

7.Check the level and insulation of transformer oil.
8.Test the operation of Buchholz Relay.

9.Insulation check

      - Between HV. and LV.

      - Between HV. Windings and Earth

      - Between LV. Windings and Earth

    Together with checking of the humidity inside the transformer.

10.Cleaning and leaking check around the tank
11.Checking of norm temperature and operation of dial thermometer.
12.Earth system checking.

 

 

 

facebook_page_plugin

csvlogo

egat  mealogo pealogo

วันนี้วันนี้386
เมื่อวานนี้เมื่อวานนี้375
สัปดาห์นี้สัปดาห์นี้1113
เดือนนี้เดือนนี้1362
ทั้งหมดทั้งหมด818995
18.97.9.170
บริษัท ซีซีหม้อแปลงไฟฟ้า จำกัด

31/1 MOO 15

Soi Ramapattana

Kingkaew 45 Rd.

Rachatava

Bangplee

Samutprakarn 10540 
Tel: 0-2738-5480-6 
Fax: 0-2738-5493

ccinfo@cctransformer.co.th

googlemap

เว๊บไซต์นี้ใช้ Cookies

เพื่อให้ท่านได้รับประสบการณ์ที่ดีบนบริการของเว็บไซต์เรา หากท่านใช้บริการเว็บไซต์นี้ต่อไปโดยไม่มีการปรับตั้งค่าใดๆ นั่นเป็นการแสดงว่าท่านอนุญาตยินยอมที่จะรับคุกกี้บนเว็บไซต์และนโยบายสิทธิส่วนบุคคลของเรา ปิดข้อความนี้ กรุณากด "Accept" สามารถเข้าอ่านนโยบายได้ที่ (Policy)